Ömer Duruk Tesisleri

Sharz · Büyükalan Mahallesi Antalya Konya Yolu Üzeri Caddesi No:151 Akseki / ANTALYA

Max power
120kW
Connectors
2
Current
DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Idle (blocking) fee after charging

Not stated officially; check the network's app.

With the Sharz app you can also charge at

Ovolt

Customer service

0850 811 72 75

Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.

Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.

See it on the map with nearby points

Connectors

  • CCS2×2

    DC

    120kW

Price

Sharz doesn't publish a price for this point. The current tariff is shown in the network's own app. Sharz website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 120 kW, it ranks 3rd by power among the 4 points with known power in Akseki district. The nearest other DC point is 50 m away: Akseki Belediye Tesisi (Trugo, 180 kW). There are 3 more DC points within 10 km. Nearby (3 km): 3 other points and 3 networks.

The Sharz network has 18 points in Antalya province; this one is among those in the Akseki area.

Power rank in Akseki
3 / 4
Nearest other DC
50 m
3 km radius
4 points · 3 networks

Charging time here from 10% to 80% (120 kW DC)

Togg T10X
≈ 40 min
Tesla Model Y Long Range
≈ 35 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Sharz app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Ömer Duruk Tesisleri?

Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Ömer Duruk Tesisleri have?

This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/7680) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy