Emarinşaat_karaman_şarjmatik
ŞarjMatik · Fatih Mahallesi Konya Yolu Caddesi 1979 Sokağı No:11 Merkez / KARAMAN
- Max power
- 60kW
- Connectors
- 6
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
- 3.7kW
Type 2×4
AC
Price
ŞarjMatik doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Shopping mall
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 12th by power among the 37 points with known power in Merkez district. The nearest other DC point is 1.6 km away: Özlem Kokoreç Nazif Kara (Powerşarj, 50 kW). There are 12 more DC points within 10 km. Nearby (3 km): 5 other points and 4 networks.
- Power rank in Merkez
- 12 / 37
- Nearest other DC
- 1.6 km
- 3 km radius
- 6 points · 4 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the ŞarjMatik app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Emarinşaat_karaman_şarjmatik?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Emarinşaat_karaman_şarjmatik have?
This point has 6 recorded sockets: 2 × CCS2 (DC, 60 kW) and 4 × Type 2 (AC, 3.7 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Panorama - 1 Sitesi - A
899 m · Epsis · Type 2
22kW
Panorama - 1 Sitesi - B
899 m · Epsis · Type 2
22kW
Özlem Kokoreç Nazif Kara
1.6 km · Powerşarj · CCS2
50kW
Aktekke Millet Bahçesi
2.2 km · Trugo · CCS2
180kW
Karaman Aktekke Millet Bahçesi
2.2 km · Trugo · CCS2
180kW
Kent Otel Karaman
3.0 km · Powerşarj · CCS2
90kW
Source: EPDK licence record (ŞRJ/8995) · Updated: 21 August 2026 at 23:51 · How the data is collected
