Güngören Class
Rst ChargePoint · Abdurrahman Nafiz Gürman Caddesi No:2200 Güngören / İSTANBUL
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
Price
Rst ChargePoint doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Café · Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 24 points with known power in Güngören district, it is 7th (120 kW). The nearest other DC point is 1.5 km away: Shell Zeytinburnu Merkez (Shell, 180 kW). There are 339 more DC points within 10 km. Within 3 km there are 139 other charging points and 27 different networks in total; if one is busy, an alternative is easy to find nearby.
The Rst ChargePoint network has 9 points in İstanbul province; this one is among those in the Güngören area.
- Power rank in Güngören
- 7 / 24
- Nearest other DC
- 1.5 km
- 3 km radius
- 140 points · 27 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Rst ChargePoint app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Güngören Class charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Güngören Class have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Suser (Yenikapı Hizmet Binası) Fatih Belediyesi AC
629 m · GSM Charge · Type 2
22kW
Duhaniye Otoparkı Şarj İstasyonu
770 m · GSM Charge · Type 2
22kW
Fatih Belediyesi Duhaniye Otoparkı AC 1
778 m · GSM Charge · Type 2
22kW
CER Yapı İstanbul
779 m · Voltrun · Type 2
21kW
İstanbul Enerji Yenikapı Opet
1.1 km · Voltrun
Atık Getirme Merkezi Fatih Belediyesi AC 1
1.1 km · GSM Charge · Type 2
22kW
Source: EPDK licence record (ŞRJ/14443) · Updated: 21 August 2026 at 23:51 · How the data is collected