Gürsu Şarj İstasyonu

Petroo · Gürsu Mahallesi 10. Caddesi Konyaaltı / ANTALYA

Max power
150kW
Connectors
4
Current
DC / HPC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×2

    HPC

    150kW
  • CCS2×2

    DC

    120kW

Price

Petroo doesn't publish a price for this point. The current tariff is shown in the network's own app.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 150 kW, it ranks 6th by power among the 55 points with known power in Konyaaltı district. The nearest other DC point is 300 m away: Konyaalti Akdeniz Taksi (Acropol, 120 kW). There are 105 more DC points within 10 km. Nearby (3 km): 35 other points and 17 networks; if one is busy, an alternative is easy to find nearby.

The Petroo network has 33 points in Antalya province; this one is among those in the Konyaaltı area.

Power rank in Konyaaltı
6 / 55
Nearest other DC
300 m
3 km radius
36 points · 17 networks

Charging time here from 10% to 80% (150 kW DC)

Togg T10X
≈ 35 min
Tesla Model Y Long Range
≈ 30 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Petroo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Gürsu Şarj İstasyonu?

Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Gürsu Şarj İstasyonu have?

This point has 4 recorded sockets: 2 × CCS2 (DC, 120 kW) and 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/3974) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy