Antalya Belediyesi Düden Otopark Şarj İstasyonu
Petroo · Çağlayan Mahallesi Lara Caddesi Muratpaşa / ANTALYA
- Max power
- 120kW
- Connectors
- 3
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
- 22kW
Type 2×1
AC
Price
Petroo doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 19th by power among the 133 points with known power in Muratpaşa district. The nearest other DC point is 750 m away: Ünal 4 Petrol (Ovolt, 50 kW). There are 90 more DC points within 10 km. Nearby (3 km): 40 other points and 18 networks; you may need different networks' apps.
The Petroo network has 33 points in Antalya province; this one is among those in the Muratpaşa area.
- Power rank in Muratpaşa
- 19 / 133
- Nearest other DC
- 750 m
- 3 km radius
- 41 points · 18 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Petroo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Antalya Belediyesi Düden Otopark Şarj İstasyonu?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Antalya Belediyesi Düden Otopark Şarj İstasyonu have?
This point has 3 recorded sockets: 2 × CCS2 (DC, 120 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Moon Suites Otel
440 m · Trugo · Type 2
22kW
BioGreen: Tam Nokta Neo - 22 kW AC
729 m · Biogreen
Ünal 4 Petrol
729 m · Ovolt · CCS2
50kW
CV Charging-Aura Berry Çağlayan
770 m · Charging Vehicles CV · Type 2 · CCS2
60kW
İstanbul Hall Wedding & Convention
862 m · Evroad · Type 2
22kW
Kushimoto Restoran
879 m · Ovolt · CCS2
200kW
Source: EPDK licence record (ŞRJ/11067) · Updated: 2 November 2026 at 17:35 · How the data is collected
