Selamet Çırçır Fabrikaları
Ovolt · Yeşiltepe Mh. Namık Kemal Blv. no: 128 KEPEZ / ANTALYA
- Max power
- 50kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 50kW
CCS2×2
DC
Price
Ovolt doesn't publish a price for this point. The current tariff is shown in the network's own app. Ovolt website
Facility
- Located at: Fuel station
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 113 points with known power in Kepez district, it is 59th (50 kW). The nearest other DC point is at the same address: Mimar Sinan Kongre Merkezi 2 (En Yakıt, 180 kW). There are 137 more DC points within 10 km. Within 3 km there are 55 other charging points and 19 different networks in total; if one is busy, an alternative is easy to find nearby.
The Ovolt network has 21 points in Antalya province; this one is among those in the Kepez area.
- Power rank in Kepez
- 59 / 113
- Nearest other DC
- at the same address
- 3 km radius
- 56 points · 19 networks
Charging time here from 10% to 80% (50 kW DC)
- Togg T10X
- ≈ 1 h 20 min
- Tesla Model Y Long Range
- ≈ 1 h 10 min
- MG4 (64 kWh)
- ≈ 1 h
- BYD Atto 3
- ≈ 55 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ovolt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Selamet Çırçır Fabrikaları charging station?
Approximate 10% to 80% times with the 50 kW DC socket: Togg T10X 1 h 20 min, Tesla Model Y Long Range 1 h 10 min, MG4 (64 kWh) 1 h and BYD Atto 3 55 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 50 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Selamet Çırçır Fabrikaları have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 50 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Mimar Sinan Kongre Merkezi 2
39 m · En Yakıt · CCS2
180kW
Mimar Sinan Kongre Merkezi 1
41 m · En Yakıt · CCS2
180kW
Dokuma Aytoç Petrol Ofisi
410 m · Trugo · Type 2
22kW
Dokumapark Kepez
644 m · En Yakıt · CCS2
180kW
Togg Store Antalya
718 m · Trugo · CCS2
180kW
Togg Deneyim Merkezi Antalya
749 m · Trugo · CCS2
180kW
Source: Sharz + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
