Hayspet Petrol
Ovolt · KAHRAMANMARAŞ TÜRKOĞLU KILILI MAH.BALSUYU BLV. NO:53/A KAHRAMANMARAŞ MERKEZ / KAHRAMANMARAS
- Max power
- 200kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 200kW
CCS2×2
HPC
Price
Ovolt doesn't publish a price for this point. The current tariff is shown in the network's own app. Ovolt website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 200 kW, it ranks 5th by power among the 97 points with known power in Kahramanmaraş province. The nearest other DC point is 5.0 km away: AMR Akaryakıt İstasyonu (Trugo, 180 kW). There is 1 more DC point within 10 km. The Ovolt network has 2 points in Kahramanmaraş province; this one is among those in the Türkoğlu area.
- Power rank in Kahramanmaraş
- 5 / 97
- Nearest other DC
- 5.0 km
Charging time here from 10% to 80% (200 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ovolt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Hayspet Petrol?
Approximate 10% to 80% times with the 200 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 200 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Hayspet Petrol have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 200 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
AMR Akaryakıt İstasyonu
5.0 km · Trugo · CCS2
180kW
Türkoğlu OSB, Kahramanmaraş
11 km · Eşarj · CCS2
120kW
Kemak Ford, Kahramanmaraş
13 km · Eşarj · CCS2
90kW
Mado - Yaşar Dondurma
13 km · En Yakıt · CCS2
60kW
Elis Kahramanmaraş - VW
14 km · D-Charge · Type 2
22kW
Elis Kahramanmaraş - Skoda Servis
14 km · D-Charge · CCS2
120kW
Source: Sharz + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
