Erdoğanlar Akaryakıt
Ovolt · Onur Mahallesi Turhan Cemal Beriker Sokağı No:453 Seyhan / ADANA
- Max power
- 50kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 50kW
CCS2×2
DC
Price
Ovolt doesn't publish a price for this point. The current tariff is shown in the network's own app. Ovolt website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 101 points with known power in Seyhan district, it is 51st (50 kW). The nearest other DC point is 250 m away: Kiza, Seyhan - DC 1 (OtoPriz, 160 kW). There are 78 more DC points within 10 km. Within 3 km there are 52 other charging points and 13 different networks in total; if one is busy, an alternative is easy to find nearby.
The Ovolt network has 3 points in Adana province; this one is among those in the Seyhan area.
- Power rank in Seyhan
- 51 / 101
- Nearest other DC
- 250 m
- 3 km radius
- 53 points · 13 networks
Charging time here from 10% to 80% (50 kW DC)
- Togg T10X
- ≈ 1 h 20 min
- Tesla Model Y Long Range
- ≈ 1 h 10 min
- MG4 (64 kWh)
- ≈ 1 h
- BYD Atto 3
- ≈ 55 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ovolt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Erdoğanlar Akaryakıt charging station?
Approximate 10% to 80% times with the 50 kW DC socket: Togg T10X 1 h 20 min, Tesla Model Y Long Range 1 h 10 min, MG4 (64 kWh) 1 h and BYD Atto 3 55 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 50 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Erdoğanlar Akaryakıt have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 50 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kiza, Seyhan - DC 1
236 m · OtoPriz · CCS2
160kW
Kiza, Seyhan - AC 1
338 m · OtoPriz · Type 2
22kW
Kiza, Seyhan - DC - 1, AC - 1
384 m · OtoPriz · CCS2 · Type 2
120kW
Kiza, Seyhan - DC - 2, AC - 2
384 m · OtoPriz · CCS2 · Type 2
120kW
Bravo Market Sanayi Şubesi Otoparkı
384 m · Voltpo · Type 2
22kW
Kiza, Seyhan - AC 2
404 m · OtoPriz · Type 2
22kW
Source: EPDK licence record (ŞRJ/14592) · Updated: 2 November 2026 at 17:35 · How the data is collected
