EKMEKÇİLER KUZEYKENT Opet
Ovolt · KASTAMONU İli MERKEZ İlçesi MERKEZ Bucak MERKEZ Köyü KUZEYKENT Mahallesi ALPARSLAN TÜRKEŞ Sokak 63 / KASTAMONU MERKEZ / KASTAMONU
- Max power
- 240kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 240kW
CCS2×2
HPC
Price
Ovolt doesn't publish a price for this point. The current tariff is shown in the network's own app. Ovolt website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 240 kW, one of the 2 most powerful points among the 36 points with known power in Merkez district. The nearest other DC point is 1.4 km away: Kastamonu Sunpet Akaryakıt İstasyonu (Trugo, 180 kW). There are 19 more DC points within 10 km. Within 3 km there are 12 other charging points and 9 different networks in total.
The Ovolt network has 2 points in Kastamonu province; this one is among those in the Kastamonu area.
- Power rank in Merkez
- 1 / 36
- Nearest other DC
- 1.4 km
- 3 km radius
- 13 points · 9 networks
Charging time here from 10% to 80% (240 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ovolt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the EKMEKÇİLER KUZEYKENT Opet charging station?
Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does EKMEKÇİLER KUZEYKENT Opet have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Halıcılar Halı-Mobilya
828 m · Enertürk Rhg Enerji · Type 2
22kW
Kastamonu Sunpet Akaryakıt İstasyonu
1.4 km · Trugo · CCS2
180kW
Dekorev Mobilya
1.4 km · Enertürk Rhg Enerji · Type 2
22kW
Kastamonu Sunpet
1.4 km · Sharz · Type 2
22kW
Akkent Sitesi
1.6 km · OnCharge · Type 2
22kW
Akkent İş Merkezi
1.7 km · OnCharge · CCS2
120kW
Source: Sharz + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
