Oyak Buca Konutları 2. Etap

OtoWATT · Aydoğdu Mahallesi 1267 Sokağı No:2/D Buca / İZMİR

Max power
59kW
Connectors
1
Current
DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Idle (blocking) fee after charging

Not stated officially; check the network's app.

Customer service

0850 575 0 343

Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.

See it on the map with nearby points

Connectors

  • CCS2×1

    DC

    59kW

Price

OtoWATT doesn't publish a price for this point. The current tariff is shown in the network's own app.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

In the power ranking among the 13 points with known power in Buca district, it is 6th (59 kW). The nearest other DC point is 2.5 km away: Opet Petrolyağ Işıkkent (WAT Mobilite, 120 kW). There are 102 more DC points within 10 km. Within 3 km there are 9 other charging points and 6 different networks in total.

The OtoWATT network has 36 points in İzmir province; this one is among those in the Buca area.

Power rank in Buca
6 / 13
Nearest other DC
2.5 km
3 km radius
10 points · 6 networks

Charging time here from 10% to 80% (59 kW DC)

Togg T10X
≈ 1 h 10 min
Tesla Model Y Long Range
≈ 55 min
MG4 (64 kWh)
≈ 50 min
BYD Atto 3
≈ 45 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the OtoWATT app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How long does charging from 10% to 80% take at the Oyak Buca Konutları 2. Etap charging station?

Approximate 10% to 80% times with the 59 kW DC socket: Togg T10X 1 h 10 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 59 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Oyak Buca Konutları 2. Etap have?

This point has 1 recorded socket: CCS2 (DC, 59 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/15518) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy