Ender Dinlenme Tesisleri
OtoWATT · Başçeşme Mahallesi Başçeşme Caddesi Bozkurt / DENİZLİ
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 120kW
CCS2×2
DC
Price
OtoWATT doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Rest area
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 4th by power among the 4 points with known power in Bozkurt district. The nearest other DC point is 3.2 km away: Ender Dinlenme Tesisleri (Neva Şarj, 320 kW). There are 3 more DC points within 10 km. The OtoWATT network has 16 points in Denizli province; this one is among those in the Bozkurt area.
- Power rank in Bozkurt
- 4 / 4
- Nearest other DC
- 3.2 km
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OtoWATT app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Ender Dinlenme Tesisleri?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Ender Dinlenme Tesisleri have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Ender Dinlenme Tesisleri DC 240 kW 05
3.2 km · Neva Şarj · CCS2
240kW
Ender Dinlenme Tesisleri DC 320 kW 04
3.2 km · Neva Şarj · CCS2
320kW
Shell Kaklık
12 km · Trugo · CCS2
180kW
Canlar Gıda- FZY 04
12 km · Fzyenergy · Type 2
7kW
M Oil Özhan Akaryakıt
15 km · Otojet · CCS2
90kW
Otojet - Özhan Akaryakıt
18 km · Otojet · CCS2
90kW
Source: EPDK licence record (ŞRJ/3842) · Updated: 2 November 2026 at 17:35 · How the data is collected