Maraş Akaryakıt, Şarköy - DC 2
OtoPriz · Maraş Akaryakıt, İstiklal Mh, İstanbul Yolu, 59800 Şarköy/Tekirdağ, Tekirdağ
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC13.90 ₺/kWh
Price
- DC
- 13.90 ₺/kWh
OtoPriz standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 58th by power among the 169 points with known power in Tekirdağ province. The nearest other DC point is at the same address: Maraş Akaryakıt, Şarköy - DC 1 (OtoPriz, 120 kW). There is 1 more DC point within 10 km. Nearby (3 km): 3 other points and 2 networks.
The DC tariff of 13.90 ₺/kWh is 7% below the median of the 75 known DC tariffs in Tekirdağ (14.90 ₺/kWh). The OtoPriz network has 12 points in Tekirdağ province; this one is among those in the Şarköy area.
- Power rank in Tekirdağ
- 58 / 169
- Nearest other DC
- at the same address
- 3 km radius
- 4 points · 2 networks
- DC tariff
- 13.90 ₺/kWh
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OtoPriz app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Maraş Akaryakıt, Şarköy - DC 2?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Maraş Akaryakıt, Şarköy - DC 2?
According to the tariff published by the OtoPriz network, prices at this point are: DC 13.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 860 ₺ at the DC tariff. Payment is made with the OtoPriz app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Maraş Akaryakıt, Şarköy - DC 2 have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
