Esmira Plaza, Selçuklu
OtoPriz · Musalla Bağları, Ruhibağdadi Sk. No:38/6, 42110 Selçuklu/Konya, Konya
- Max power
- 160kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 160kW
CCS2×2
HPC13.90 ₺/kWh
Price
- DC
- 13.90 ₺/kWh
OtoPriz standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 160 kW, it ranks 31st by power among the 123 points with known power in Selçuklu district. The nearest other DC point is 150 m away: Bayır Dıamond Otel (Trugo, 180 kW). There are 90 more DC points within 10 km. Nearby (3 km): 74 other points and 24 networks.
The DC tariff of 13.90 ₺/kWh is 7% below the median of the 102 known DC tariffs in Konya (14.98 ₺/kWh). The OtoPriz network has 19 points in Konya province; this one is among those in the Selçuklu area.
- Power rank in Selçuklu
- 31 / 123
- Nearest other DC
- 150 m
- 3 km radius
- 75 points · 24 networks
- DC tariff
- 13.90 ₺/kWh
Charging time here from 10% to 80% (160 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OtoPriz app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Esmira Plaza, Selçuklu?
Approximate 10% to 80% times with the 160 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 160 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Esmira Plaza, Selçuklu?
According to the tariff published by the OtoPriz network, prices at this point are: DC 13.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 860 ₺ at the DC tariff. Payment is made with the OtoPriz app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Esmira Plaza, Selçuklu have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 160 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Bayır Dıamond Otel
163 m · Trugo · CCS2
180kW
Özkaymak Konya Hotel, Konya
276 m · Eşarj · CCS2
120kW
Astorşarj Özkaymak Konya Otel Elektrikli Araç Şarj İstasyonu
276 m · Astor Şarj · CCS2
300kW
Tcdd Konya Selçuklu YHT
326 m · U-Şarj · Type 2 · CCS2
200kW
Econ - Kulesite
395 m · Energy Charging Operator Network ECON · CCS2 · Type 2
150kW
Enntepe AVM Açık Otopark
478 m · ZES · Type 2 · CCS2
240kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
