Eraltınlar Petrol TP, Aksaray
OtoPriz · Topakkaya Kasabası Gülhane Mah. E-90 Karayolu Üzeri No:74, 68000, Aksaray/Merkez, Aksaray
- Max power
- 200kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 200kW
CCS2×2
HPC13.90 ₺/kWh
Price
- DC
- 13.90 ₺/kWh
OtoPriz standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 200 kW, it ranks 3rd by power among the 44 points with known power in Merkez district. The nearest other DC point is 7.7 km away: Aksaray Has Döner (ZES, 400 kW). There are 4 more DC points within 10 km. The DC tariff of 13.90 ₺/kWh is 7% below the median of the 37 known DC tariffs in Aksaray (14.98 ₺/kWh).
The OtoPriz network has 3 points in Aksaray province; this one is among those in the Aksaray area.
- Power rank in Merkez
- 3 / 44
- Nearest other DC
- 7.7 km
- DC tariff
- 13.90 ₺/kWh
Charging time here from 10% to 80% (200 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OtoPriz app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Eraltınlar Petrol TP, Aksaray?
Approximate 10% to 80% times with the 200 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 200 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Eraltınlar Petrol TP, Aksaray?
According to the tariff published by the OtoPriz network, prices at this point are: DC 13.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 860 ₺ at the DC tariff. Payment is made with the OtoPriz app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Eraltınlar Petrol TP, Aksaray have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 200 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Blue Akaryakıt Enerji Sanayi VE Ticaret Anonim Şirketi
3.7 km · ŞarjMatik · Type 2
11kW
Aksaray Has Döner
7.7 km · ZES · CCS2
400kW
Aksaray Has Döner
8.0 km · Trugo · CCS2
180kW
Mercedes Benz Türkiye
8.2 km · Trugo · CCS2
180kW
Mehmet Önemli Petrol Alpet
9.0 km · ZES · Type 2
22kW
Köfteci Yusuf Aksaray
10.0 km · En Yakıt · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
