TotalEnergies Yanıklar Petrol
Otojet · Gölevi, Devlet Sahil Yolu No:356, 52300 Ünye/Ordu, Türkiye, Ordu
- Max power
- 60kW
- Connectors
- 3
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
- 22kW
Type 2×1
AC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 13th by power among the 22 points with known power in Ünye district. The nearest other DC point is at the same address: Otojet - Yanıklar Petrol (Otojet, 60 kW). There are 12 more DC points within 10 km. Nearby (3 km): 6 other points and 4 networks.
The Otojet network has 4 points in Ordu province; this one is among those in the Ünye area.
- Power rank in Ünye
- 13 / 22
- Nearest other DC
- at the same address
- 3 km radius
- 7 points · 4 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at TotalEnergies Yanıklar Petrol?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does TotalEnergies Yanıklar Petrol have?
This point has 3 recorded sockets: 2 × CCS2 (DC, 60 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Otojet - Yanıklar Petrol
48 m · Otojet · CCS2 · Type 2
60kW
Ünye Belediyesi Göl Evi Kafe, Ünye
621 m · OtoPriz · Type 2 · CCS2
120kW
Ünye Belediyesi Batıpark Millet Bahçesi, Ünye
1.8 km · OtoPriz · Type 2
22kW
Ünye Belediyesi Batıpark Millet Bahçesi, Ünye - DC 1
1.8 km · OtoPriz · CCS2
120kW
Atakale Restaurant
2.4 km · Elaris Elektrikli Araç Şarj Hizmetleri · Type 2
22kW
Ordu BBLD Çamlık Otopark
2.9 km · Trugo · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
