TotalEnergies Silver Sun
Otojet · Cırgalan Mahallesi Sivas Bulvarı No:429 Kocasinan Kayseri, KAYSERİ
- Max power
- 150kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 150kW
CCS2×2
HPC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 150 kW, it ranks 25th by power among the 73 points with known power in Kocasinan district. The nearest other DC point is 500 m away: Astorşarj THN Elektrik Elektrikli Araç Şarj İstasyonu (Astor Şarj, 160 kW). There are 85 more DC points within 10 km. Nearby (3 km): 10 other points and 8 networks.
The Otojet network has 2 points in Kayseri province; this one is among those in the Kocasinan area.
- Power rank in Kocasinan
- 25 / 73
- Nearest other DC
- 500 m
- 3 km radius
- 11 points · 8 networks
Charging time here from 10% to 80% (150 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at TotalEnergies Silver Sun?
Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does TotalEnergies Silver Sun have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Astorşarj THN Elektrik Elektrikli Araç Şarj İstasyonu
491 m · Astor Şarj · CCS2
160kW
Bimev Mobilya
766 m · Enertürk Rhg Enerji · Type 2
11kW
THN İnşaat Elektrik
1.1 km · Trugo · CCS2
180kW
Gökkent Nalçik Bulvarı
1.9 km · K-Şarj · CCS2 · Type 2
180kW
Toki 1 Kadir HAS Bulv.
2.1 km · K-Şarj · CCS2 · Type 2
180kW
THE Kayseri Loft Otel
2.1 km · Mycharge · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
