TotalEnergies Sadık Oto Merkez
Otojet · Izmir Asfaltı Üzeri No:150 Gümüşler Merkez/Denizli, Türkiye, Denizli
- Max power
- 150kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 150kW
CCS2×2
HPC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 150 kW, it ranks 21st by power among the 70 points with known power in Merkezefendi district. The nearest other DC point is 800 m away: Tuncerhan Otomotiv, Denizli (Eşarj, 120 kW). There are 54 more DC points within 10 km. Nearby (3 km): 33 other points and 16 networks; you may need different networks' apps.
The Otojet network has 10 points in Denizli province; this one is among those in the Merkezefendi area.
- Power rank in Merkezefendi
- 21 / 70
- Nearest other DC
- 800 m
- 3 km radius
- 34 points · 16 networks
Charging time here from 10% to 80% (150 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at TotalEnergies Sadık Oto Merkez?
Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does TotalEnergies Sadık Oto Merkez have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Xşarj-000053
490 m · Xşarj
Power Elektronik AKİ Endüstri AC Şarj İstasyonu
552 m · Power Elektronik Sanayi VE Ticaret Limited Şirketi · Type 2
22kW
AKİ Endustri AC Şarj İstasyonu
552 m · Powerşarj · Type 2
22kW
Tuncerhan Otomotiv, Denizli
798 m · Eşarj · CCS2
120kW
Coşkunlar Otomotiv Denizli DC
907 m · ZES · CCS2 · Type 2 · CHAdeMO
180kW
Coşkunlar Otomotiv Denizli
907 m · ZES · Type 2 · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
