TotalEnergies Ata Petrol Aladdin Şubesi
Otojet · Şemsitebrizi Mahallesi Ankara Caddesi No 10 Karatay Konya , Konya
- Max power
- 60kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 63 points with known power in Karatay district, it is 21st (60 kW). The nearest other DC point is 50 m away: Otojet - Ata Petrol Alaaddin Şubesi (Otojet, 60 kW). There are 89 more DC points within 10 km. Within 3 km there are 72 other charging points and 24 different networks in total.
The Otojet network has 12 points in Konya province; this one is among those in the Karatay area.
- Power rank in Karatay
- 21 / 63
- Nearest other DC
- 50 m
- 3 km radius
- 73 points · 24 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the TotalEnergies Ata Petrol Aladdin Şubesi charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does TotalEnergies Ata Petrol Aladdin Şubesi have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
