Otojet - Nitar Tarım Petrol
Otojet · İlhanlı Mahallesi Kayseri Yolu Caddesi No:84/1 Merkez / NİĞDE
- Max power
- 60kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 19th by power among the 31 points with known power in Merkez district. The nearest other DC point is 1.5 km away: Otopratik, Ufuk Güngör, Niğde (Eşarj, 90 kW). There are 16 more DC points within 10 km. Nearby (3 km): 10 other points and 5 networks; you may need different networks' apps.
The Otojet network has 16 points in Niğde province; this one is among those in the Niğde area.
- Power rank in Merkez
- 19 / 31
- Nearest other DC
- 1.5 km
- 3 km radius
- 11 points · 5 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Otojet - Nitar Tarım Petrol?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Otojet - Nitar Tarım Petrol have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Otopratik, Ufuk Güngör, Niğde
1.5 km · Eşarj · CCS2
90kW
Niğde Belediyesi Otobüs Terminali
1.9 km · Otojet · CCS2 · Type 2
60kW
Otojet - Niğde Belediyesi Başkanlığı
2.1 km · Otojet · CCS2 · Type 2
60kW
Niğde Belediyesi Başkanlığı 22 KW - 2
2.2 km · Otojet · Type 2
22kW
Niğde Belediyesi Başkanlığı
2.2 km · Otojet · CCS2 · Type 2
60kW
Uslu Çelik
2.2 km · Powerşarj
Source: EPDK licence record (ŞRJ/6946) · Updated: 2 November 2026 at 17:35 · How the data is collected
