M oil - Dere Petrol
Otojet · Konya Cihanbeyli Ağabeyli Mahallesi Ankarahayır 924/1 No :0 Cihanbeyli / Konya, Konya
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
Otojet doesn't publish a price for this point. The current tariff is shown in the network's own app. Otojet website
Facility
- Located at: Fuel station
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 180 kW, one of the 5 most powerful points among the 6 points with known power in Cihanbeyli district. The nearest other DC point is 5.3 km away: Otojet - M Oil Dere Petrol (Otojet, 180 kW). There is 1 more DC point within 10 km. The Otojet network has 12 points in Konya province; this one is among those in the Cihanbeyli area.
- Power rank in Cihanbeyli
- 1 / 6
- Nearest other DC
- 5.3 km
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Otojet app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the M oil - Dere Petrol charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does M oil - Dere Petrol have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Otojet - M Oil Dere Petrol
5.3 km · Otojet · CCS2
180kW
Poçan Petrol Aytemiz
11 km · Trugo · CCS2
180kW
Aytemiz Petrol Poçan
11 km · Trugo · CCS2
180kW
Econ - ECZ. Ayşe Adam
14 km · Energy Charging Operator Network ECON · Type 2
3kW
ANS, Konya
24 km · Eşarj · CCS2
180kW
Cihanbeyli Opet Tuncer Akaryakıt İstasyonu
24 km · Trugo · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
