Ordu Marino Port AVM
OnCharge · Ümrübey Mah. Kumsal Sok Marino Port AVM No:LY-Park Büfe-6
- Max power
- 200kW
- Connectors
- 1
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 200kW
CCS2×1
HPC13.50 ₺/kWh
Price
- DC
- 13.50 ₺/kWh
OnCharge standard tariff; prices may vary by location. Tariff source
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
Ranks first among the 5 points with known power in Gülyalı district with 200 kW of power. The nearest other DC point is 300 m away: Opet Güngör Kardeşler Ordu (WAT Mobilite, 120 kW). There are 5 more DC points within 10 km. The DC tariff of 13.50 ₺/kWh is 9% below the median of the 39 known DC tariffs in Ordu (14.90 ₺/kWh).
The OnCharge network has 2 points in Ordu province; this one is among those in the Gülyalı area.
- Power rank in Gülyalı
- 1 / 5
- Nearest other DC
- 300 m
- DC tariff
- 13.50 ₺/kWh
Charging time here from 10% to 80% (200 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OnCharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Ordu Marino Port AVM charging station?
Approximate 10% to 80% times with the 200 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 200 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Ordu Marino Port AVM?
According to the tariff published by the OnCharge network, prices at this point are: DC 13.50 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 840 ₺ at the DC tariff. Payment is made with the OnCharge app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Ordu Marino Port AVM have?
This point has 1 recorded socket: CCS2 (HPC, 200 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Ordu Marino Port AVM open 24/7?
Yes, according to the records Ordu Marino Port AVM is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the OnCharge app.
Other points nearby
Source: OnCharge + EPDK licence record · Updated: 21 August 2026 at 22:03 · How the data is collected
