Durmuşoğlu Petrol
OnCharge · Merkez Mahallesi Ankara Caddesi Kaynaşlı / DÜZCE
- Max power
- 120kW
- Connectors
- 1
- Current
- DC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.
See it on the map with nearby pointsConnectors
- 120kW
CCS2×1
DC13.50 ₺/kWh
Price
- DC
- 13.50 ₺/kWh
OnCharge standard tariff; prices may vary by location. Tariff source
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 20th by power among the 31 points with known power in Kaynaşlı district. The nearest other DC point is at the same address: Bozbey Dinlenme Tesisleri, Düzce (Eşarj, 180 kW). There are 27 more DC points within 10 km. Nearby (3 km): 6 other points and 5 networks; if one is busy, an alternative is easy to find nearby.
The DC tariff of 13.50 ₺/kWh is 9% below the median of the 40 known DC tariffs in Düzce (14.90 ₺/kWh). The OnCharge network has 5 points in Düzce province; this one is among those in the Kaynaşlı area.
- Power rank in Kaynaşlı
- 20 / 31
- Nearest other DC
- at the same address
- 3 km radius
- 7 points · 5 networks
- DC tariff
- 13.50 ₺/kWh
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OnCharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Durmuşoğlu Petrol?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Durmuşoğlu Petrol?
According to the tariff published by the OnCharge network, prices at this point are: DC 13.50 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 840 ₺ at the DC tariff. Payment is made with the OnCharge app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Durmuşoğlu Petrol have?
This point has 1 recorded socket: CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Durmuşoğlu Petrol open 24/7?
Yes, according to the records Durmuşoğlu Petrol is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the OnCharge app.
Source: EPDK licence record (ŞRJ/6756) · Updated: 2 November 2026 at 17:35 · How the data is collected
