Bolt Enerji Çözümleri
OnCharge · Akçaburgaz Mah. 395. Sok. No:15/2 Han Plaza
- Max power
- 160kW
- Connectors
- 1
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 160kW
CCS2×1
HPC13.50 ₺/kWh
Price
- DC
- 13.50 ₺/kWh
OnCharge standard tariff; prices may vary by location. Tariff source
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 160 kW, it ranks 22nd by power among the 143 points with known power in Esenyurt district. The nearest other DC point is 950 m away: Pelican Hill Malikaneleri/ Vale Şarj 360 kW Çift Soketli Cihaz (Vale, 360 kW). There are 145 more DC points within 10 km. Nearby (3 km): 38 other points and 16 networks; if one is busy, an alternative is easy to find nearby.
The DC tariff of 13.50 ₺/kWh is 9% below the median of the 877 known DC tariffs in İstanbul (14.90 ₺/kWh). The OnCharge network has 44 points in İstanbul province; this one is among those in the Esenyurt area.
- Power rank in Esenyurt
- 22 / 143
- Nearest other DC
- 950 m
- 3 km radius
- 39 points · 16 networks
- DC tariff
- 13.50 ₺/kWh
Charging time here from 10% to 80% (160 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OnCharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Bolt Enerji Çözümleri?
Approximate 10% to 80% times with the 160 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 160 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Bolt Enerji Çözümleri?
According to the tariff published by the OnCharge network, prices at this point are: DC 13.50 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 840 ₺ at the DC tariff. Payment is made with the OnCharge app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Bolt Enerji Çözümleri have?
This point has 1 recorded socket: CCS2 (HPC, 160 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Bolt Enerji Çözümleri open 24/7?
Yes, according to the records Bolt Enerji Çözümleri is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the OnCharge app.
Other points nearby
West Blocks Residence
646 m · ZES
Pelican Hill Malikaneleri/ Vale Şarj 360 kW Çift Soketli Cihaz
938 m · Vale · CCS2
360kW
EVSolt - İlay Elektrik
1.0 km · EVSolt · Type 2
22kW
Petrol Ofisi - Akçaburgaz
1.0 km · e-POwer · Type 2
22kW
İstanbul Üniversitesi-Cerrahpaşa Büyükçekmece
1.3 km · Q Charge · Type 2
22kW
Pelikan Hill Malikaneleri
1.3 km · Vale · CCS2
360kW
Source: OnCharge + EPDK licence record · Updated: 21 August 2026 at 22:03 · How the data is collected
