Gimat Gross DC 120 kW

Neva Şarj · Macun, Bağdat Cd. No:101/3, 06374 Yenimahalle/Ankara, Türkiye, Ankara

Max power
120kW
Connectors
2
Current
DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

Nearby while you chargeRestaurantParking

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×2

    DC

    120kW

Price

Neva Şarj doesn't publish a price for this point. The current tariff is shown in the network's own app. Neva Şarj website

Facility

  • Located at: Shopping mall
  • Nearby: Restaurant · Parking
  • According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 120 kW, it ranks 82nd by power among the 473 points with known power in Yenimahalle district. The nearest other DC point is 100 m away: Podium AVM (En Yakıt, 180 kW). There are 410 more DC points within 10 km. Nearby (3 km): 119 other points and 28 networks; if one is busy, an alternative is easy to find nearby.

The Neva Şarj network has 375 points in Ankara province; this one is among those in the Yenimahalle area.

Power rank in Yenimahalle
82 / 473
Nearest other DC
100 m
3 km radius
120 points · 28 networks

Charging time here from 10% to 80% (120 kW DC)

Togg T10X
≈ 40 min
Tesla Model Y Long Range
≈ 35 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Neva Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Gimat Gross DC 120 kW?

Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Gimat Gross DC 120 kW have?

This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy