Dur Yolcu Sarıkavak Dinlenme Tesisleri DC 240 kW
Neva Şarj · Uluçam, Denizli Cd., 20570 Kale/Denizli, 20
- Max power
- 240kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 240kW
CCS2×2
HPC
Price
Neva Şarj doesn't publish a price for this point. The current tariff is shown in the network's own app. Neva Şarj website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 240 kW, one of the 2 most powerful points among the 6 points with known power in Kale district. The nearest other DC point is at the same address: Dur Yolcu Sarıkavak Dinlenme Tesisleri DC 120 kW (Neva Şarj, 120 kW). There are 3 more DC points within 10 km. Nearby (3 km): 5 other points and 3 networks.
The Neva Şarj network has 6 points in Denizli province; this one is among those in the Kale area.
- Power rank in Kale
- 1 / 6
- Nearest other DC
- at the same address
- 3 km radius
- 6 points · 3 networks
Charging time here from 10% to 80% (240 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Neva Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Dur Yolcu Sarıkavak Dinlenme Tesisleri DC 240 kW?
Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Dur Yolcu Sarıkavak Dinlenme Tesisleri DC 240 kW have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Dur Yolcu Sarıkavak Dinlenme Tesisleri DC 120 kW
0 m · Neva Şarj · CCS2
120kW
TotalEnergies Sadık Oto Kale
348 m · Otojet · Type 2
22kW
Shell Kale Merkez
759 m · Trugo · CCS2
180kW
Otojet - Sadıkoğlu Petrol
1.4 km · Otojet · Type 2
22kW
Dur Yolcu Sarıkavak Dinlenme Tesisleri
1.6 km · Neva Şarj · CCS2
240kW
Nutova Tesisleri
18 km · Trugo · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
