Ninova Park AVM
Mycharge · Selahattin Eyyubi Mahallesi Bayındırlık Caddesi No:13/1 Bağlar / DİYARBAKIR
- Max power
- 160kW
- Connectors
- 9
- Current
- HPC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 160kW
CCS2×2
HPC
- 22kW
Type 2×7
AC
Price
Mycharge doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Shopping mall
- Nearby: Café · Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 24 points with known power in Bağlar district, it is 8th (160 kW). The nearest other DC point is 900 m away: Otopratik (Miram), Diyarbakır (Eşarj, 120 kW). There are 53 more DC points within 10 km. Within 3 km there are 47 other charging points and 20 different networks in total; you may need different networks' apps.
- Power rank in Bağlar
- 8 / 24
- Nearest other DC
- 900 m
- 3 km radius
- 48 points · 20 networks
Charging time here from 10% to 80% (160 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Mycharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Ninova Park AVM charging station?
Approximate 10% to 80% times with the 160 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 160 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Ninova Park AVM have?
This point has 9 recorded sockets: 2 × CCS2 (HPC, 160 kW) and 7 × Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Türk Telekom Diyarbakır Huzurevleri Ofisi
683 m · E4 Şarj · Type 2
22kW
Otopratik (Miram), Diyarbakır
902 m · Eşarj · CCS2
120kW
Otopratik (Miram), Diyarbakır
902 m · Eşarj · CCS2
120kW
Ncity AVM Diyarbakır
905 m · CheckPoint · CCS2
120kW
Otojet - Karpet Petrol
959 m · Otojet · CCS2
60kW
LİV Suit Hotel
959 m · Voltrun · Type 2
22kW
Source: EPDK licence record (ŞRJ/5518) · Updated: 2 November 2026 at 17:35 · How the data is collected
