Migros Ortaköy MMM
Miggo · Ortaköy Mahallesi Dereboyu Caddesi No:2 Beşiktaş / İSTANBUL
- Max power
- 120kW
- Connectors
- 3
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
- 22kW
Type 2×1
AC
Price
Miggo doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 104 points with known power in Beşiktaş district, it is 13th (120 kW). The nearest other DC point is 700 m away: Varlık Fonu Merkez Bina (Trugo, 180 kW). There are 449 more DC points within 10 km. Within 3 km there are 170 other charging points and 44 different networks in total; you may need different networks' apps.
The Miggo network has 18 points in İstanbul province; this one is among those in the Beşiktaş area.
- Power rank in Beşiktaş
- 13 / 104
- Nearest other DC
- 700 m
- 3 km radius
- 171 points · 44 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Miggo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Migros Ortaköy MMM charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Migros Ortaköy MMM have?
This point has 3 recorded sockets: 2 × CCS2 (DC, 120 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Migros Ortaköy
0 m · ZES · Type 2
22kW
One Ortaköy Otoparkı 11 kW AC 03
195 m · GEL DOL · Type 2
22kW
One Ortaköy Otoparkı 11 kW AC 02
195 m · GEL DOL · Type 2
22kW
One Ortaköy Otoparkı 11 kW AC 01
195 m · GEL DOL · Type 2
22kW
One Ortaköy
373 m · GEL DOL · Type 2
22kW
Maksimum Evler Sitesi
433 m · Voltrun · Type 2
21kW
Source: EPDK licence record (ŞRJ/3883) · Updated: 2 November 2026 at 17:35 · How the data is collected
