LUMICLE TUZLA TEPEÖREN 180 kW DC
Lumicle · Tepeören, Atayolu Cd. No:3 34959, 34959 Tuzla/İstanbul, Türkiye, İstanbul
- Max power
- 180kW
- Connectors
- 1
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×1
HPC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 105 points with known power in Tuzla district, it is 5th (180 kW). The nearest other DC point is 1.7 km away: Sabancı Üniversitesi, Tuzla (Eşarj, 120 kW). There are 97 more DC points within 10 km. Within 3 km there are 23 other charging points and 8 different networks in total.
The Lumicle network has 34 points in İstanbul province; this one is among those in the Tuzla area.
- Power rank in Tuzla
- 5 / 105
- Nearest other DC
- 1.7 km
- 3 km radius
- 24 points · 8 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the LUMICLE TUZLA TEPEÖREN 180 kW DC charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does LUMICLE TUZLA TEPEÖREN 180 kW DC have?
This point has 1 recorded socket: CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
LUMICLE TUZLA TEPEÖREN 22 kW AC-3
0 m · Lumicle · Type 2
22kW
LUMICLE TUZLA TEPEÖREN 22 kW AC-2
0 m · Lumicle · Type 2
22kW
LUMICLE TUZLA TEPEÖREN 22 kW AC-1
0 m · Lumicle · Type 2
22kW
Bepaş Akfırat
155 m · Enertürk Rhg Enerji
Sabancı Üniversitesi, Tuzla
1.7 km · Eşarj · CCS2
120kW
İstanbul Anadolu Yakası Organize Sanayi Bölgesi, Tuzla
2.1 km · Eşarj · CCS2
120kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
