LUMICLE OKSİJEN O167 İSTANBUL YÖNÜ 240 kW DC-4
Lumicle · 8GGC26VC+8H, 1
- Max power
- 240kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 240kW
CCS2×4
HPC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Facility
- Located at: Rest area
- Nearby: Toilet
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 240 kW, it ranks 3rd by power among the 20 points with known power in Mustafakemalpaşa district. The nearest other DC point is 50 m away: Oksijen O167 M.Kemal Paşa İstanbul Y. (En Yakıt, 180 kW). There are 7 more DC points within 10 km. Nearby (3 km): 5 other points and 3 networks.
The Lumicle network has 29 points in Bursa province; this one is among those in the Mustafakemalpaşa area.
- Power rank in Mustafakemalpaşa
- 3 / 20
- Nearest other DC
- 50 m
- 3 km radius
- 6 points · 3 networks
Charging time here from 10% to 80% (240 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at LUMICLE OKSİJEN O167 İSTANBUL YÖNÜ 240 kW DC-4?
Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does LUMICLE OKSİJEN O167 İSTANBUL YÖNÜ 240 kW DC-4 have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Oksijen O167 M.Kemal Paşa İstanbul Y.
55 m · En Yakıt · CCS2
180kW
LUMICLE OKSİJEN O167 İZMİR YÖNÜ 240 kW DC-4
196 m · Lumicle · CCS2
240kW
Oksijen O167 M.Kemal Paşa İzmir Y.
254 m · En Yakıt · CCS2
180kW
Shell Mustafakemalpaşa OHT Doğu
2.4 km · Shell · CCS2
180kW
Shell Mustafakemalpaşa OHT Batı
2.4 km · Shell · CCS2
180kW
Kemalpaşa AC 1
5.2 km · Greenwatt · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
