LUMICLE MUĞLA KUUM OTEL 180 kW DC

Lumicle · Göltürkbükü, Atatürk Cd. No:150, 48400 Bodrum/Muğla, MUĞLA

Max power
180kW
Connectors
1
Current
HPC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×1

    HPC

    180kW

Price

Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 180 kW, it ranks 4th by power among the 202 points with known power in Bodrum district. The nearest other DC point is 400 m away: 48-Muğla-Bodrum-Kuum Hotel (Lumicle, 180 kW). There are 48 more DC points within 10 km. Nearby (3 km): 12 other points and 10 networks; if one is busy, an alternative is easy to find nearby.

The Lumicle network has 3 points in Muğla province; this one is among those in the Bodrum area.

Power rank in Bodrum
4 / 202
Nearest other DC
400 m
3 km radius
13 points · 10 networks

Charging time here from 10% to 80% (180 kW DC)

Togg T10X
≈ 35 min
Tesla Model Y Long Range
≈ 25 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at LUMICLE MUĞLA KUUM OTEL 180 kW DC?

Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does LUMICLE MUĞLA KUUM OTEL 180 kW DC have?

This point has 1 recorded socket: CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy