LUMICLE BOLU HİGHWAY 180 kW DC-3
Lumicle · Kuruçay Kpr, Istanbul 227. Km Elmalık Mevkii No:5, Anadolu Otoyolu Abant Bağlantısı, 14030 Yolçatı/Bolu Merkez/Bolu, Bolu
- Max power
- 180kW
- Connectors
- 1
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×1
HPC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Facility
- Located at: Rest area
- Nearby: Toilet · Café · Restaurant · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 23rd by power among the 99 points with known power in Merkez district. The nearest other DC point is at the same address: LUMICLE BOLU HİGHWAY 180 kW DC-1 (Lumicle, 240 kW). There are 48 more DC points within 10 km. Nearby (3 km): 34 other points and 21 networks; if one is busy, an alternative is easy to find nearby.
The Lumicle network has 5 points in Bolu province; this one is among those in the Bolu area.
- Power rank in Merkez
- 23 / 99
- Nearest other DC
- at the same address
- 3 km radius
- 35 points · 21 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at LUMICLE BOLU HİGHWAY 180 kW DC-3?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does LUMICLE BOLU HİGHWAY 180 kW DC-3 have?
This point has 1 recorded socket: CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
LUMICLE BOLU HİGHWAY 180 kW DC-1
0 m · Lumicle · CCS2
240kW
LUMICLE BOLU HİGHWAY 180 kW DC-4
0 m · Lumicle · CCS2
180kW
LUMICLE BOLU HİGHWAY 180 kW DC-2
0 m · Lumicle · CCS2
180kW
14-Bolu-Highway Outlet AVM
18 m · Lumicle · CCS2
180kW
Highway Outlet AVM 1
18 m · En Yakıt · CCS2
180kW
Highway Outlet AVM 2
18 m · En Yakıt · CCS2
180kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
