10-Balıkesir-O204-İzmiryönü

Lumicle · İbirler Mahallesi 46999 Caddesi No:31 Karesi / BALIKESİR

Max power
240kW
Connectors
4
Current
HPC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.

See it on the map with nearby points

Connectors

  • CCS2×4

    HPC

    240kW

Price

Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

In the power ranking among the 70 points with known power in Karesi district, it is 13th (240 kW). The nearest other DC point is at the same address: 10-Balıkesir-O204-İstanbulyönü (Lumicle, 240 kW). There are 23 more DC points within 10 km. Within 3 km there are 12 other charging points and 5 different networks in total; if one is busy, an alternative is easy to find nearby.

The Lumicle network has 27 points in Balıkesir province; this one is among those in the Karesi area.

Power rank in Karesi
13 / 70
Nearest other DC
at the same address
3 km radius
13 points · 5 networks

Charging time here from 10% to 80% (240 kW DC)

Togg T10X
≈ 35 min
Tesla Model Y Long Range
≈ 20 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How long does charging from 10% to 80% take at the 10-Balıkesir-O204-İzmiryönü charging station?

Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does 10-Balıkesir-O204-İzmiryönü have?

This point has 4 recorded sockets: 4 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/14049) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy