10-Balıkesir-O204-İstanbulyönü
Lumicle · İbirler Mahallesi 46999 Caddesi No:31 Karesi / BALIKESİR
- Max power
- 240kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.
See it on the map with nearby pointsConnectors
- 240kW
CCS2×4
HPC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 70 points with known power in Karesi district, it is 13th (240 kW). The nearest other DC point is at the same address: 10-Balıkesir-O204-İzmiryönü (Lumicle, 240 kW). There are 23 more DC points within 10 km. Within 3 km there are 12 other charging points and 5 different networks in total.
The Lumicle network has 27 points in Balıkesir province; this one is among those in the Karesi area.
- Power rank in Karesi
- 13 / 70
- Nearest other DC
- at the same address
- 3 km radius
- 13 points · 5 networks
Charging time here from 10% to 80% (240 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the 10-Balıkesir-O204-İstanbulyönü charging station?
Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does 10-Balıkesir-O204-İstanbulyönü have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Source: EPDK licence record (ŞRJ/14051) · Updated: 2 November 2026 at 17:35 · How the data is collected
