Umutkent Sitesi DC Şarj
Greenwatt · Ataevler, Umut Sk., 16140 Ni̇lüfer/Bursa, Bursa
- Max power
- 60kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
Price
Greenwatt doesn't publish a price for this point. The current tariff is shown in the network's own app. Greenwatt website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 265 points with known power in Nilüfer district, it is 60th (60 kW). The nearest other DC point is 300 m away: Renault Mais Bursa Şube (Otojet, 150 kW). There are 146 more DC points within 10 km. Within 3 km there are 93 other charging points and 26 different networks in total; if one is busy, an alternative is easy to find nearby.
The Greenwatt network has 97 points in Bursa province; this one is among those in the Nilüfer area.
- Power rank in Nilüfer
- 60 / 265
- Nearest other DC
- 300 m
- 3 km radius
- 94 points · 26 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Greenwatt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Umutkent Sitesi DC Şarj charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Umutkent Sitesi DC Şarj have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Bulvar Lotus Sitesi AC-1
116 m · Greenwatt · Type 2
22kW
Bulvar Lotus Sitesi AC-2
131 m · Greenwatt · Type 2
22kW
Renault Mais Bursa Şube
324 m · Otojet · CCS2
150kW
Otojet Mais Motorlu Araçlar İml. A.Ş - Bursa Şube
333 m · Otojet · CCS2
150kW
B-Charge - Maresan Otomotiv
505 m · B-Charge · CCS2 · Type 2
120kW
Ataevler
525 m · OnLIFE · Type 2 · CCS2
60kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
