Auto Analiz
Greenwatt · Oruç Reis, Batı Çevre Yolu No:95, 46100 Onikişubat/Kahramanmaraş, Türkiye, Kahramanmaraş
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
Greenwatt doesn't publish a price for this point. The current tariff is shown in the network's own app. Greenwatt website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 5th by power among the 64 points with known power in Onikişubat district. The nearest other DC point is 1.0 km away: Kahramanmaraş Ticaret Borsası-1 (Trugo, 180 kW). There are 38 more DC points within 10 km. Nearby (3 km): 17 other points and 9 networks; you may need different networks' apps.
The Greenwatt network has 31 points in Kahramanmaraş province; this one is among those in the Onikişubat area.
- Power rank in Onikişubat
- 5 / 64
- Nearest other DC
- 1.0 km
- 3 km radius
- 18 points · 9 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Greenwatt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Auto Analiz?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Auto Analiz have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kahramanmaraş Ticaret Borsası-1
1.0 km · Trugo · CCS2
180kW
Kahramanmaraş Ticaret Borsası-2
1.1 km · Trugo · CCS2
180kW
Gimpa Gross Market
1.8 km · Voltrun · CCS2
90kW
Elis Kahramanmaraş - VW
1.9 km · D-Charge · Type 2
22kW
Elis Kahramanmaraş - Skoda Servis
1.9 km · D-Charge · CCS2
120kW
Elis Kahramanmaraş - Skoda Showroom
1.9 km · D-Charge · CCS2
360kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
