Akçeşme Dinlenme Tesisleri

Greenwatt · XFRH+Q8 Kıyakdede/Şarkikaraağaç/Isparta, Türkiye, Isparta

Max power
120kW
Connectors
2
Current
DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×2

    DC

    120kW

Price

Greenwatt doesn't publish a price for this point. The current tariff is shown in the network's own app. Greenwatt website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 120 kW, it ranks 35th by power among the 125 points with known power in Isparta province. The nearest other DC point is 12 km away: Gülal Tarım (Trugo, 180 kW). There is no other DC point within 10 km. There is no other registered charging point within 10 km; plan your charging around this one before you set off.

Power rank in Isparta
35 / 125
Nearest other DC
12 km
Other points within 10 km
none

Charging time here from 10% to 80% (120 kW DC)

Togg T10X
≈ 40 min
Tesla Model Y Long Range
≈ 35 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Greenwatt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Akçeşme Dinlenme Tesisleri?

Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Akçeşme Dinlenme Tesisleri have?

This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy