Mete Plaza Avrupa Sarj

Gladsome · İçerenköy Mahallesi Bahçelerarası Sokağı No:43 Ataşehir / İSTANBUL

Max power
60kW
Connectors
2
Current
AC / DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×1

    DC

    60kW
  • Type 2×1

    AC

    22kW

Price

Gladsome doesn't publish a price for this point. The current tariff is shown in the network's own app.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 60 kW, it ranks 66th by power among the 177 points with known power in Ataşehir district. The nearest other DC point is 150 m away: Kosifler Oto Bostancı (5 Şarj, 180 kW). There are 346 more DC points within 10 km. Nearby (3 km): 107 other points and 39 networks; if one is busy, an alternative is easy to find nearby.

The Gladsome network has 14 points in İstanbul province; this one is among those in the Ataşehir area.

Power rank in Ataşehir
66 / 177
Nearest other DC
150 m
3 km radius
108 points · 39 networks

Charging time here from 10% to 80% (60 kW DC)

Togg T10X
≈ 1 h 5 min
Tesla Model Y Long Range
≈ 55 min
MG4 (64 kWh)
≈ 50 min
BYD Atto 3
≈ 45 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Gladsome app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Mete Plaza Avrupa Sarj?

Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Mete Plaza Avrupa Sarj have?

This point has 2 recorded sockets: Type 2 (AC, 22 kW) and CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/14355) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy