Palladium AVM - Ataşehir
Fast-Go · Barbaros Mahallesi Halk Sokağı No:8 Ataşehir / İSTANBUL
- Max power
- 180kW
- Connectors
- 5
- Current
- HPC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
- 120kW
CCS2×2
DC
- 30kW
CCS2×1
DC
Price
Fast-Go doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Restaurant
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 9th by power among the 177 points with known power in Ataşehir district. The nearest other DC point is at the same address: Palladium AVM, Ataşehir (Eşarj, 120 kW). There are 338 more DC points within 10 km. Nearby (3 km): 205 other points and 55 networks; you may need different networks' apps.
- Power rank in Ataşehir
- 9 / 177
- Nearest other DC
- at the same address
- 3 km radius
- 206 points · 55 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Fast-Go app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Palladium AVM - Ataşehir?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Palladium AVM - Ataşehir have?
This point has 5 recorded sockets: 2 × CCS2 (HPC, 180 kW), 2 × CCS2 (DC, 120 kW) and CCS2 (DC, 30 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Palladium AVM, Ataşehir
0 m · Eşarj · CCS2
120kW
Doğuş Dijital Enerji- Sahan Kebap Ataşehir
76 m · Dgdoğuşgıda · Type 2
22kW
Enerjisa (Ayedaş) Erenköy OM
325 m · Eşarj · CCS2
120kW
Otojet - DOCO Kozyatağı
353 m · Otojet · CCS2
150kW
Doğuş Dijital Enerji-Elite Hotel Dragos
353 m · Dgdoğuşgıda · Type 2
22kW
İstanbul Optimum
398 m · Rönesans Charger · Type 2 · CCS2
180kW
Source: EPDK licence record (ŞRJ/10340) · Updated: 2 November 2026 at 17:35 · How the data is collected
