Meydan AVM
EVC Charge · Fabrikalar Mahallesi 27 Sokağı No:3 Merkez / KIRIKKALE
- Max power
- 160kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 160kW
CCS2×2
HPC
Price
EVC Charge doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Shopping mall
- Nearby: Café · Restaurant · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 160 kW, it ranks 6th by power among the 13 points with known power in Merkez district. The nearest other DC point is 500 m away: Üçyıldız Kardeşler, Kırıkkale Merkez (OtoPriz, 180 kW). There are 21 more DC points within 10 km. Nearby (3 km): 13 other points and 8 networks.
- Power rank in Merkez
- 6 / 13
- Nearest other DC
- 500 m
- 3 km radius
- 14 points · 8 networks
Charging time here from 10% to 80% (160 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the EVC Charge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Meydan AVM?
Approximate 10% to 80% times with the 160 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 160 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Meydan AVM have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 160 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Özel Yaşam Hastanesi, Kırıkkale
553 m · Eşarj · CCS2
120kW
Ulubatlı Hasan Caddesi
692 m · Trugo · CCS2
180kW
Kırıkkale Ulubatlı Hasan Caddesi
706 m · Trugo · CCS2
180kW
Kadoil, Elvan Çakır, Kırıkkale
1.8 km · Eşarj · CCS2
120kW
Kırıkkale Cebecioğlu Petrol
2.0 km · Trugo · CCS2
180kW
AG Lotus Tower Sitesi
2.3 km · Voltrun · Type 2
22kW
Source: EPDK licence record (ŞRJ/14134) · Updated: 2 November 2026 at 17:35 · How the data is collected