Koluman, Sancaktepe
Eşarj · Fatih Mahallesi Yakacık Caddesi No:33 Sancaktepe / İSTANBUL
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Şarj bittikten sonra ilk 15 dk ücretsiz. AC: 15-30 dk 100 ₺, 30-45 dk 150 ₺, 45-60 dk 200 ₺, 60-120 dk 300 ₺. DC: 150 / 250 / 400 / 600 ₺. 120 dk'dan sonra her saat +100 ₺ (tek işlemde en çok DC 2.800 ₺, AC 2.500 ₺).source
With the Eşarj app you can also charge at
Trugo (Eşarj uygulamasında haritada "R" simgesi)
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 120kW
CCS2×2
DC14.90 ₺/kWh
Price
- DC
- 14.90 ₺/kWh
Eşarj standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 98 points with known power in Sancaktepe district, it is 23rd (120 kW). The nearest other DC point is at the same address: Koluman, Samandıra (Eşarj, 120 kW). There are 315 more DC points within 10 km. Within 3 km there are 45 other charging points and 19 different networks in total.
The DC tariff of 14.90 ₺/kWh is in line with the İstanbul median (14.90 ₺/kWh). The Eşarj network has 192 points in İstanbul province; this one is among those in the Sancaktepe area.
- Power rank in Sancaktepe
- 23 / 98
- Nearest other DC
- at the same address
- 3 km radius
- 46 points · 19 networks
- DC tariff
- 14.90 ₺/kWh
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Eşarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Koluman, Sancaktepe charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Koluman, Sancaktepe?
According to the tariff published by the Eşarj network, prices at this point are: DC 14.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 920 ₺ at the DC tariff. Payment is made with the Eşarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Koluman, Sancaktepe have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Koluman, Samandıra
0 m · Eşarj · CCS2
120kW
Koluman Mercedes, Sancaktepe
120 m · Eşarj · CCS2
120kW
Koluman Mercedes, Samandıra
137 m · Eşarj · CCS2
120kW
Resim İstanbul Sitesi, Sancaktepe
366 m · Eşarj · CCS2
180kW
Resim İstanbul Sitesi
366 m · Trugo · CCS2
180kW
Evora Park Sitesi
601 m · WAT Mobilite · Type 2 · CCS2
60kW
Source: EPDK licence record (ŞRJ/10940) · Updated: 21 August 2026 at 23:51 · How the data is collected
