Akkent 1 Konutları 1/Blok

Epsis · Kardelen Mahallesi 2164 Sokağı No:3 / 1 Yenimahalle / ANKARA

Max power
30kW
Connectors
2
Current
DC / AC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×1

    DC

    30kW
  • Type 2×1

    AC

    22kW

Price

Epsis doesn't publish a price for this point. The current tariff is shown in the network's own app. Epsis website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 30 kW, it ranks 153rd by power among the 473 points with known power in Yenimahalle district. The nearest other DC point is 350 m away: Damla Petrol (Trugo, 180 kW). There are 460 more DC points within 10 km. Nearby (3 km): 272 other points and 46 networks; if one is busy, an alternative is easy to find nearby.

The Epsis network has 589 points in Ankara province; this one is among those in the Yenimahalle area.

Power rank in Yenimahalle
153 / 473
Nearest other DC
350 m
3 km radius
273 points · 46 networks

Charging time here from 10% to 80% (30 kW DC)

Togg T10X
≈ 2 h 15 min
Tesla Model Y Long Range
≈ 1 h 55 min
MG4 (64 kWh)
≈ 1 h 35 min
BYD Atto 3
≈ 1 h 30 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Epsis app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Akkent 1 Konutları 1/Blok?

Approximate 10% to 80% times with the 30 kW DC socket: Togg T10X 2 h 15 min, Tesla Model Y Long Range 1 h 55 min, MG4 (64 kWh) 1 h 35 min and BYD Atto 3 1 h 30 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 30 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Akkent 1 Konutları 1/Blok have?

This point has 2 recorded sockets: CCS2 (DC, 30 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/13141) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy