Myway 202
En Yakıt · Kazımdirik, 5711/21. Sk., 35100 Bornova/İzmir
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
En Yakıt doesn't publish a price for this point. The current tariff is shown in the network's own app. En Yakıt website
Facility
- Access: Aktif
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 5th by power among the 79 points with known power in Bornova district. The nearest other DC point is 1.5 km away: Has Otomotiv, Bornova, İzmir (Eşarj, 45 kW). There are 87 more DC points within 10 km. Nearby (3 km): 57 other points and 20 networks; you may need different networks' apps.
The En Yakıt network has 47 points in İzmir province; this one is among those in the Bornova area.
- Power rank in Bornova
- 5 / 79
- Nearest other DC
- 1.5 km
- 3 km radius
- 58 points · 20 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the En Yakıt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Myway 202?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Myway 202 have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Turk Telekom Isikkent Binasi
695 m · E4 Şarj · Type 2
22kW
Şarjon Ekinox Armada Gayrimenkul
874 m · Şarjon · Type 2
22kW
Rüya Evleri, Bornova - AC 2
1.4 km · OtoPriz · Type 2
22kW
Rüya Evleri, Bornova - AC 1
1.4 km · OtoPriz · Type 2
22kW
Has Otomotiv, Bornova, İzmir
1.5 km · Eşarj · CHAdeMO · CCS2 · Type 2
45kW
Zeplin Trademark Studio
1.5 km · Zeplin Enerji · Type 2 · CCS2
160kW
Source: En Yakıt + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
