Fercan Otoyol Kuyucak Şantiyesi
En Yakıt · Karapınar Mahallesi Karapınar Caddesi No:1 Kuyucak / AYDIN
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
En Yakıt doesn't publish a price for this point. The current tariff is shown in the network's own app. En Yakıt website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 213 points with known power in Aydın province, it is 12th (180 kW). The nearest other DC point is 10 km away: TotalEnergies Özaydın Petrol Nazilli (Otojet, 150 kW). There is no other DC point within 10 km. There is no other registered charging point within 10 km; plan your charging around this one before you set off.
The En Yakıt network has 13 points in Aydın province; this one is among those in the Kuyucak area.
- Power rank in Aydın
- 12 / 213
- Nearest other DC
- 10 km
- Other points within 10 km
- none
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the En Yakıt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Fercan Otoyol Kuyucak Şantiyesi charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Fercan Otoyol Kuyucak Şantiyesi have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
TotalEnergies Özaydın Petrol Nazilli
10 km · Otojet · CCS2
150kW
Otojet - Özaydın Petrol
11 km · Otojet · CCS2
150kW
Dört Renk Okulları
12 km · ZES · Type 2
22kW
ANG Akaryakıt, Nazilli
12 km · OtoPriz · CCS2
60kW
ANG Akaryakıt, Nazilli
12 km · OtoPriz · Type 2
22kW
MER Sitesi
13 km · Enertürk Rhg Enerji · CCS2 · Type 2
120kW
Source: EPDK licence record (ŞRJ/15426) · Updated: 2 November 2026 at 17:35 · How the data is collected
