Anadolu Ajansı - Ankara
En Yakıt · Eti Mahallesi Gazi Mustafa Kemal Sokağı No:132/1 Çankaya / ANKARA
- Max power
- 150kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 150kW
CCS2×2
HPC
Price
En Yakıt doesn't publish a price for this point. The current tariff is shown in the network's own app. En Yakıt website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 150 kW, it ranks 107th by power among the 1,037 points with known power in Çankaya district. The nearest other DC point is at the same address: Ankara Tren Garı DC-1, AC-1, AC-2, AC-3, AC-4 (Beefull, 60 kW). There are 417 more DC points within 10 km. Nearby (3 km): 196 other points and 42 networks; if one is busy, an alternative is easy to find nearby.
The En Yakıt network has 30 points in Ankara province; this one is among those in the Çankaya area.
- Power rank in Çankaya
- 107 / 1,037
- Nearest other DC
- at the same address
- 3 km radius
- 197 points · 42 networks
Charging time here from 10% to 80% (150 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the En Yakıt app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Anadolu Ajansı - Ankara?
Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Anadolu Ajansı - Ankara have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Ankara Tren Garı DC-1, AC-1, AC-2, AC-3, AC-4
0 m · Beefull · CCS2 · Type 2
60kW
Yaşar Centre
152 m · Varr TM · CCS2
80kW
Hotel İçkale
167 m · ZES · Type 2
22kW
Ak-Han İş Merkezi 22 kW Kablolu
254 m · Neva Şarj · Type 2
22kW
AK-HAN İş merkezi
280 m · Neva Şarj · Type 2
22kW
Cermodern
294 m · ZES · Type 2 · CCS2
60kW
Source: EPDK licence record (ŞRJ/5871) · Updated: 2 November 2026 at 17:35 · How the data is collected
