EKOŞARJ - Mbs Group
Ekoşarj En Ekonomik, En Ekolojik Şekil · Muratgören Mahallesi Merkez / MUŞ
- Max power
- 50kW
- Connectors
- 2
- Current
- AC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 50kW
CCS2×1
DC
- 22kW
Type 2×1
AC
Price
Ekoşarj En Ekonomik, En Ekolojik Şekil doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 50 kW, it ranks 9th by power among the 19 points with known power in Merkez district. The nearest other DC point is 6.2 km away: Güvenoğulları Petrol (Green Science, 120 kW). There are 4 more DC points within 10 km. The Ekoşarj En Ekonomik, En Ekolojik Şekil network has 8 points in Muş province; this one is among those in the Muş area.
- Power rank in Merkez
- 9 / 19
- Nearest other DC
- 6.2 km
Charging time here from 10% to 80% (50 kW DC)
- Togg T10X
- ≈ 1 h 20 min
- Tesla Model Y Long Range
- ≈ 1 h 10 min
- MG4 (64 kWh)
- ≈ 1 h
- BYD Atto 3
- ≈ 55 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ekoşarj En Ekonomik, En Ekolojik Şekil app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at EKOŞARJ - Mbs Group?
Approximate 10% to 80% times with the 50 kW DC socket: Togg T10X 1 h 20 min, Tesla Model Y Long Range 1 h 10 min, MG4 (64 kWh) 1 h and BYD Atto 3 55 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 50 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does EKOŞARJ - Mbs Group have?
This point has 2 recorded sockets: Type 2 (AC, 22 kW) and CCS2 (DC, 50 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
EKOŞARJ - Ada Önceller 2
0 m · Ekoşarj En Ekonomik, En Ekolojik Şekil · Type 2
22kW
Güvenoğulları Petrol
6.2 km · Green Science · CCS2
120kW
Muş Valilik
9.1 km · Trugo · CCS2
180kW
Global, Muş Merkez
9.5 km · OtoPriz · CCS2
120kW
Global Otel, Muş Merkez
9.8 km · OtoPriz · CCS2
180kW
Feritogulları Petrol
11 km · Green Science · CCS2
120kW
Source: EPDK licence record (ŞRJ/10928) · Updated: 2 November 2026 at 17:35 · How the data is collected