Boshcar Küçükköy
Efish · Esentepe Mahallesi 2976 Sokağı No:NO:3/A Sultangazi / İSTANBUL
- Max power
- 40kW
- Connectors
- 1
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 40kW
CCS2×1
DC
Price
Efish doesn't publish a price for this point. The current tariff is shown in the network's own app. Efish website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 22 points with known power in Sultangazi district, it is 12th (40 kW). The nearest other DC point is 350 m away: Öksüzoğlu Plaza DC-1, AC-1, AC-2 (Beefull, 160 kW). There are 283 more DC points within 10 km. Within 3 km there are 53 other charging points and 25 different networks in total; you may need different networks' apps.
The Efish network has 109 points in İstanbul province; this one is among those in the Sultangazi area.
- Power rank in Sultangazi
- 12 / 22
- Nearest other DC
- 350 m
- 3 km radius
- 54 points · 25 networks
Charging time here from 10% to 80% (40 kW DC)
- Togg T10X
- ≈ 1 h 40 min
- Tesla Model Y Long Range
- ≈ 1 h 25 min
- MG4 (64 kWh)
- ≈ 1 h 10 min
- BYD Atto 3
- ≈ 1 h 10 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Efish app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Boshcar Küçükköy charging station?
Approximate 10% to 80% times with the 40 kW DC socket: Togg T10X 1 h 40 min, Tesla Model Y Long Range 1 h 25 min, MG4 (64 kWh) 1 h 10 min and BYD Atto 3 1 h 10 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 40 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Boshcar Küçükköy have?
This point has 1 recorded socket: CCS2 (DC, 40 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Öksüzoğlu Plaza DC-1, AC-1, AC-2
344 m · Beefull · CCS2 · Type 2
160kW
İstanbul Üniversitesi Cerrahpaşa Sultangazi
901 m · Trugo · Type 2
22kW
İstanbul Üniversitesi Cerrahpaşa Sultangazi
919 m · Q Charge · Type 2
22kW
Astorşarj Sultangazi Vega AVM Elektrikli Araç Şarj İstasyonu
960 m · Astor Şarj · Type 2 · CCS2
160kW
Tempoint Konutları
960 m · Voltrun · Type 2
21kW
Medipol Mega Üniversite Hastanesi
981 m · WAT Mobilite · CCS2 · Type 2
120kW
Source: EPDK licence record (ŞRJ/6099) · Updated: 2 November 2026 at 17:35 · How the data is collected
