Strong A CAR Lara DC-1
Beefull · Güzeloluk Mahallesi 1830 Sokağı No:52/YANI Muratpaşa / ANTALYA
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source
With the Beefull app you can also charge at
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 120kW
CCS2×2
DC
Price
Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 133 points with known power in Muratpaşa district, it is 19th (120 kW). The nearest other DC point is 1.1 km away: Astorşarj Özkaymak Falez Elektrikli Araç Şarj İstasyonu (Astor Şarj, 300 kW). There are 130 more DC points within 10 km. Within 3 km there are 50 other charging points and 19 different networks in total; you may need different networks' apps.
The Beefull network has 21 points in Antalya province; this one is among those in the Muratpaşa area.
- Power rank in Muratpaşa
- 19 / 133
- Nearest other DC
- 1.1 km
- 3 km radius
- 51 points · 19 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Strong A CAR Lara DC-1 charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Strong A CAR Lara DC-1 have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Astorşarj Özkaymak Falez Elektrikli Araç Şarj İstasyonu
1.1 km · Astor Şarj · CCS2
300kW
Wind OF Lara Hotel & SPA
1.1 km · Voltrun · Type 2
22kW
Kırcami Petrol Antalya
1.5 km · ZES · Type 2
22kW
Özel Antalya Koleji Lara Kampüs
1.8 km · ZES · Type 2
22kW
Corendon Merkez Ofis
1.9 km · Voltrun · Type 2
22kW
Comfy Otel Antalya
2.0 km · Voltrun · Type 2
22kW
Source: EPDK licence record (ŞRJ/7043) · Updated: 2 November 2026 at 17:35 · How the data is collected
