KMO NAKKAŞ GÜNEY OHT 1 ve KMO NAKKAŞ GÜNEY OHT 2

Beefull · Nakkaş Mahallesi Ören Bayırı Caddesi No:34 Çatalca / İSTANBUL

Max power
200kW
Connectors
2
Current
HPC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Idle (blocking) fee after charging

AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source

With the Beefull app you can also charge at

WAT Mobilite

Customer service

0850 811 00 18

Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.

See it on the map with nearby points

Connectors

  • CCS2×2

    HPC

    200kW

Price

Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

At 200 kW, one of the 3 most powerful points among the 31 points with known power in Çatalca district. The nearest other DC point is 100 m away: Nakkaş OHT Güney (OnCharge, 180 kW). There are 28 more DC points within 10 km. Nearby (3 km): 7 other points and 3 networks.

The Beefull network has 129 points in İstanbul province; this one is among those in the Çatalca area.

Power rank in Çatalca
1 / 31
Nearest other DC
100 m
3 km radius
8 points · 3 networks

Charging time here from 10% to 80% (200 kW DC)

Togg T10X
≈ 35 min
Tesla Model Y Long Range
≈ 25 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at KMO NAKKAŞ GÜNEY OHT 1 ve KMO NAKKAŞ GÜNEY OHT 2?

Approximate 10% to 80% times with the 200 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 200 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does KMO NAKKAŞ GÜNEY OHT 1 ve KMO NAKKAŞ GÜNEY OHT 2 have?

This point has 2 recorded sockets: 2 × CCS2 (HPC, 200 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/3423) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy