KMO ADAPAZARI OHT GÜNEY 1 ve KMO ADAPAZARI OHT GÜNEY 2
Beefull · Korucuk Mahallesi Kuzey Marmara Otoyolu Adapazarı / SAKARYA
- Max power
- 160kW
- Connectors
- 3
- Current
- HPC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source
With the Beefull app you can also charge at
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.
See it on the map with nearby pointsConnectors
- 160kW
CCS2×2
HPC
- 22kW
Type 2×1
AC
Price
Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 160 kW, it ranks 13th by power among the 42 points with known power in Adapazarı district. The nearest other DC point is at the same address: Adapazarı Kuzey OHT (OnCharge, 180 kW). There are 13 more DC points within 10 km. Nearby (3 km): 10 other points and 4 networks; if one is busy, an alternative is easy to find nearby.
The Beefull network has 4 points in Sakarya province; this one is among those in the Adapazarı area.
- Power rank in Adapazarı
- 13 / 42
- Nearest other DC
- at the same address
- 3 km radius
- 11 points · 4 networks
Charging time here from 10% to 80% (160 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at KMO ADAPAZARI OHT GÜNEY 1 ve KMO ADAPAZARI OHT GÜNEY 2?
Approximate 10% to 80% times with the 160 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 160 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does KMO ADAPAZARI OHT GÜNEY 1 ve KMO ADAPAZARI OHT GÜNEY 2 have?
This point has 3 recorded sockets: 2 × CCS2 (HPC, 160 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Source: EPDK licence record (ŞRJ/3539) · Updated: 2 November 2026 at 17:35 · How the data is collected
