ERG TUZ Gölü OHT Niğde Yönü DC-1, DC-2
Beefull · Büyükdamlacık Mahallesi Büyükdamlacık Sokağı No:2 Erg Ankara-niğde Otoyolu Tuzgölü Oht Niğde Yönü Şereflikoçhisar / ANKARA
- Max power
- 180kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source
With the Beefull app you can also charge at
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×4
HPC
Price
Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 3rd by power among the 20 points with known power in Şereflikoçhisar district. The nearest other DC point is at the same address: Tuz Gölü Tesisleri (Obişarj, 60 kW). There are 10 more DC points within 10 km. Nearby (3 km): 6 other points and 4 networks; you may need different networks' apps.
The Beefull network has 32 points in Ankara province; this one is among those in the Şereflikoçhisar area.
- Power rank in Şereflikoçhisar
- 3 / 20
- Nearest other DC
- at the same address
- 3 km radius
- 7 points · 4 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at ERG TUZ Gölü OHT Niğde Yönü DC-1, DC-2?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does ERG TUZ Gölü OHT Niğde Yönü DC-1, DC-2 have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Tuz Gölü Tesisleri
0 m · Obişarj · CCS2
60kW
TUZ Gölü Tesisleri Ankara Yönü
0 m · En Yakıt · CCS2
180kW
TUZ Gölü Tesisleri Niğde Yönü
0 m · En Yakıt · CCS2
180kW
ERG TUZ Gölü OHT Ankara Yönü DC-1, DC-2
0 m · Beefull · CCS2
180kW
Astorşarj Tuzgölü Atlı Dinlenme Tesisi Niğde Yönü
0 m · Astor Şarj · CCS2
180kW
Astorşarj Tuzgölü Atlı Dinlenme Tesisi Ankara Yönü
0 m · Astor Şarj · CCS2
180kW
Source: EPDK licence record (ŞRJ/13508) · Updated: 2 November 2026 at 17:35 · How the data is collected
